Say YES or NO to an AI Data Centre?

As artificial intelligence, cloud computing and digital services expand rapidly, the infrastructure powering our digital world is placing growing pressure on physical resources.
AI data centres are arriving in Ontario fast. Some towns see jobs and tax dollars. Others see risk. Here is a plain look at both sides.
Data centres require enormous amounts of electricity, and water for cooling, creating an increasingly important sustainability challenge. Communities and climate advocates are increasingly questioning whether the societal and economic benefits of AI software justify the immense environmental toll.
There are currently 14 underway AI data centres, and another +100 have been announced or under review in Ontario, adding to the roughly 50 to 100 classic data centres already operating within the province. The Independent Electricity System Operator (IESO) reports approximatively 7,000MW (7GW) of active data centre requests, which is over a quarter of Ontario’s entire peak demand, or the entire power output of the Bruce Power Nuclear Station.
In September 2026, the federal government released “Canada’s Responsible Data Centre Development Principles,” it’s only a framework of recommendations but nothing legally binding.
Under Ontario’s Bill 40 and the province's August 2026 Data Centre Playbook, large data centres must obtain ministerial approval to connect to the power grid. However, land-use planning remains a municipal responsibility, and most existing zoning bylaws, including in Wasaga Beach, do not distinguish data centres from standard warehouses or light industrial uses.
Pollster Angus Reid reported that 64 per cent of Canadians want AI data centre development limited, mainly over concerns about energy and water use, and worries that ratepayers will face higher energy bills.
Because of the sheer volume of these requests and the associated noise/water footprints, several municipalities (including Oakville, Mississauga, and Sault Ste. Marie) have enacted interim control by-laws to freeze new data centre zoning while provincial frameworks are finalized. Dozens of Canadian municipalities have paused (or tried to pause) development on AI data centres while rules are written to regulate them.
For the reasons below, my view is that Wasaga Beach, or any Town of South Georgian Bay or Simcoe County, should not welcome an AI data centre today, but it could prepare, just in case, so it can say YES to the right project or NO to the wrong one.
Water: how much is too much?
Wasaga’s drinking water comes from six groundwater wells with a combined limit of about 31.4 million liters per day (per the Town’s permit limit), serving about 20,000 residents (per the Town’s 2024 inspection).
Data centres use water mainly for cooling:
A Microsoft facility in Etobicoke is approved for up to 39.75 liters per second. That is about 3.4 million liters a day, roughly 11% of Wasaga’s well capacity (my calculation).
A Microsoft complex in Vaughan is expected to use 730 million liters a year, about 2 million liters a day or 6% of Wasaga’s supply.
One estimate says a 1-megawatt facility may use up to 25.5 million liters a year. A 40 MW site, the size proposed in Mississauga, could use roughly 2.8 million liters a day.
For reference: a 40MW data centre is a large facility but Hyperscale AI data centres can go up to +1GW for a Next-Gen AI Training Supercluster.
Peak summer demand from Wasaga cottagers and tourists already strains the system. A data centre drawing on the same aquifer could compete with residents and visitors.
Hot water and Georgian Bay
Evaporative cooling mostly consumes water rather than releasing it. Some designs do discharge warm water, and warm discharge into a bay or river can:
Lower oxygen levels for fish
Encourage algae growth
Stress cold-water species
Any discharge would need provincial environmental approval. The safest design is closed-loop cooling with no discharge to Georgian Bay or the Nottawasaga River. The province’s draft playbook also favours cooling systems that avoid water or use closed loops, and projects that put waste heat to use, but again it is only a recommendation, nothing binding.
Ecosystem and tourism
Wasaga’s natural shoreline of Georgian Bay and Nottawasaga River are its main asset, and it holds coastal dunes, tourist beaches and an endangered Piping Plover species.
Noise, light, construction and any water impacts near the shoreline could harm both the tourism economy and the birds. Hot water release in the river or bay would harm the ecosystem. Wasaga’s brand is a clean, natural beach, that could be damaged.
Electricity bills and Wasaga Distribution
Wasaga Distribution serves about 15,000 residential and commercial customers with over 235 km of line, delivering around 60MW average, 75MW at peak. Such a small utility could be badly stretched by one very large customer, and upgrades to substations and lines could end up on every resident’s bill.
The province’s draft rules offer some limited protection:
Data centres would pay all their electricity costs, at a higher rate than other industrial users.
Facilities over 1MW must also fund their own required infrastructure upgrades, with no cash incentives.
Facility could produce it’s own behind-the-meter power, which would be done with highly polluting diesel or gas generators.
For reference: a 40MW data centre is a large facility but Hyperscale AI data centres can go up to 1GW for a Next-Gen AI Training Supercluster.
These provincial rules are still a draft, so Wasaga Beach residents’ protection should be written into the connection agreement with Wasaga Distribution.
Pros
Tax base: A Mississauga proposal cited $1.6 million a year in property tax, which would be significant for a town of Wasaga’s size.
Construction jobs: Projects bring temporary work.
Local benefits: Waste heat could warm nearby buildings, and the town could negotiate community funds.
Cons
Few permanent jobs: The same Mississauga project promised only 63 sustained full-time-equivalent jobs.
Water and heat risks to the aquifer and Georgian Bay
Risks to the beach tourism and Wasaga Beach brand
Possible bill increases if upgrades are not fully paid by the developer
Safety: Mississauga council raised fire concerns about lithium-ion batteries and 14 diesel generators.
Weak local rules: Most Ontario municipalities have no data centre zoning yet, and Wasaga likely has none.
Recommendation
As of now, there is no public proposal for a data centre in Wasaga Beach, Wasaga is a small, tourism-driven town on Georgian Bay with a rare ecosystem and a small local electric utility, so the probability to get one is quite low, mainly due to the grid and communication bottleneck (10-50MW). However, some vacant lands currently zoned as commercial or mixed-used like some along Beachwood Road in the West End or others in the East or South End, could become a target.
Towns like Midland or Owen Sound are a bit better target, but best targets in Simcoe County are in the Innisfill-Barrie-Orillia Corridor. Hydro One is currently planning a new Sudbury-Barrie high voltage 500KV transmission line to bring more power from North to Essa Transformer Station. There are currently 4 major enterprise/colocation data centres operating in Simcoe County (all located in Barrie), along with 1 massive new grid connection request to IESO for a 1,380 MW (1.3GW) mega AI Hyperscale AI Training data center facility in Barrie.
Wasaga Beach, and other Simcoe County towns, should prepare now rather than approve or ban outright.
Pass a temporary pause (like Mississauga’s) while rules are written.
Write zoning rules with size limits, noise limits, pollution limits, fire safety and setbacks from the river and Georgian Bay shoreline and plover habitat.
Ban discharge to Georgian Bay (or other lake) and the Nottawasaga River (or other river). Require closed-loop cooling or dry-cooling and public water-use reporting.
Ask Wasaga Distribution (or other local hydro) for its available capacity and for a cost study showing how residential rates would be protected.
Require an independent environmental review covering the aquifer, the shoreline and the plovers.
Make community benefits binding, with enforceable water caps and penalties.
Hold open public consultation before any vote.
In summary, despite the low probability, the easy path is a moratorium total ban, but in moderate path, a smaller edge data centre with closed-loop cooling or dry cooling, full cost recovery and strong environmental safeguards could possibly fit in Wasaga Beach or other South Georgian Bay towns. A large, water-hungry and electricity-hungry AI data centre does not belong in Wasaga or anywhere beside Georgian Bay.
Therefore Wasaga Beach Council, and other towns Councils in Simcoe County, should get prepared and ready by proactively updating their zoning bylaws, evaluating and defining local water, wastewater safeguards, evaluating electrical grid capacity and mandating Behind-The-Meter power generation with limits on noise and GHG emissions, establishing a Siteplan Control Requirements, verifying full cost recovery and potentially draft a Community Benefit Agreement (CBA) framework before a formal AI Data Centre application arrives.
Blog post by Gerard Dusastre.





Comments